Qtech Control
International Inspection Engineers, Cargo Surveyors and Technical Resources
WIND TURBINE QUALITY CONTROL GALLERY
Tower Sections loaded and weld secured on deck at loadport.
Damaged blade edge at discharge port attributed to stevedore damage,
Caged blades stowed on deck during the loading process.
Damage to tower section by stevedores during discharge operations.
Scraped and dirty tower section noted after discharge from the vessel.
Witnessing stevedores using correct lifting equipment and techniques appropriate for various wind turbine components.
Witnessing loading of cargo into the hold and recording / protesting against any damage caused.
Witnessing stevedoring operations and checking for damage.
Caged blades and towers sections stowed on the deck ready for discharge.
Witnessing stevedoring operations when placing cargo onto road transport at the discharge port.
Caged blades temporarily stowed on the quayside during discharge operations.
Supervising movements from quayside to final destination.